Electricity here runs $34.87 per million Btu
Washington homes pay that rate, among the costs that make up a power bill statewide. A furnace that wastes less of every therm shows that difference each month it runs.
Takes about a minute. No obligation.
Washington homes pay that rate, among the costs that make up a power bill statewide. A furnace that wastes less of every therm shows that difference each month it runs.
Two furnaces can heat the same house, but the one that converts more of its fuel into heat instead of losing it up the flue costs less to run all winter. That difference is worth asking about before you pick a unit.

NOAA nClimDiv, 1991–2020 normals
Furnaces in Pomeroy run September through June, with winter nights averaging 27°F.
Ten months of heat a year means the furnace rarely gets a break, so it needs to be sized right from the start.




A high AFUE rating only pays off if the furnace is sized to the house. An oversized unit cycles on and off instead of running steady, and that short cycling wastes some of the efficiency you paid for. An undersized one runs long stretches trying to catch up, which costs more on every bill given what power runs here. The load calculation a contractor does before installation is what makes sure the AFUE number on the box actually shows up in what you pay. Ask to see that calculation, not just the efficiency rating, before deciding on a unit.
Heat runs here from September through June, with August the only month it doesn't. Installing before September means the furnace goes in on a normal schedule, with time to size it right for this house, instead of getting picked in a rush once the cold sets in.
Find a contractorThirty four winter storms hit this county between 2015 and 2024. Every time snow piles up or the wind picks up, the furnace is what keeps the house warm. A unit sized right for Pomeroy keeps up on those nights, not just the easy ones in between. That's what to ask a contractor about when comparing models for this house.
A new furnace isn't just set next to the old one. The old unit gets disconnected from the gas line, the vent and the ductwork, then hauled out whole. That takes the same care as putting the new one in, since the gas and vent connections have to be capped or redone right either way.
An old furnace and a new one rarely draft the same way, especially if the new unit runs higher efficiency than the one it's replacing. A contractor checks whether the existing vent pipe still works for the new furnace or needs to change, and whether the gas line is sized for it. Reusing what's there without checking it is how venting problems start.
Size is what moves the price most. A furnace too small runs constantly and still can't keep up on the coldest nights. One too large cycles on and off fast, which wears out parts sooner and leaves rooms uneven. Getting the size right takes a room by room load calculation, not a guess based on the old unit's rating. Venting matters too. A high efficiency furnace needs a different kind of vent pipe than an older, less efficient one, and if the ductwork is undersized or leaky, even a well chosen furnace won't heat evenly. Any of that can mean more work than swapping one box for another, and that work is part of what you're paying for.
Install day starts with shutting off the gas and power to the old unit before anything gets disconnected. The furnace comes out, then whoever's doing the work checks the vent pipe, the gas line and the return ductwork before setting the new one in place. Those connections get fitted to the new furnace, not just reattached the way they were. Once it's hooked up, the gas line gets tested for leaks and the vent gets checked for proper draft. The last step is firing it up and running it through a full cycle, checking the flame, the airflow at the registers and the temperature rise, before calling it done. A furnace that passes all of that on day one tends to run clean for years after.
