Winter storms are the norm here
Douglas County logged 209 winter storm events between 2015 and 2024. Snow and ice loading, not just cold air, are what the outdoor unit has to sit through most years.

Takes about a minute. No obligation.
Douglas County logged 209 winter storm events between 2015 and 2024. Snow and ice loading, not just cold air, are what the outdoor unit has to sit through most years.
Nearly a quarter of Washington households lost power for a day or more in 2024. A heat pump needs electricity to run in either direction, so if the outage worries you, a backup heat source or a plan for hot water is worth discussing before installation, not after.

NOAA nClimDiv, 1991–2020 normals
Heat here runs September through May, nine months of the year.
August is the month to get a heat pump installed, before the first cold morning asks it to work.




East Wenatchee falls under climate zone 5B, a cool zone where heating is the bigger job for the system than cooling. Any split-system heat pump installed here has to meet the federal minimum for units made from 2023 on. That's 14.3 SEER2 for cooling and 7.5 HSPF2 for heating. The HSPF2 number is the one to pay attention to in a zone like this, since the unit will spend more months pulling heat in than pushing it out. A federal tax credit is available toward the cost of a qualifying heat pump, on top of meeting these minimums.
A heat pump sized and rated to the federal minimum handles this climate without upgrading further. At 11.90 cents per kilowatt-hour, Washington's electricity costs less than most of the country, so there's no local case for paying more for a higher-efficiency unit than the job calls for. Get the sizing and the HSPF2 rating right for this zone, and a standard installation is the right one.
Find a contractor
Whatever is heating this home now gets disconnected once the new heat pump is running, but what happens to it depends on what it is. A furnace or an old heat pump usually gets hauled off by the crew doing the install, since most contractors fold removal into the job. If the old system burns gas or oil, the line feeding it has to be capped off properly, not just shut at the valve. An old electric furnace or baseboard heat can sometimes stay in place as backup, wired to kick on only if the heat pump can't keep up, though that's a decision to make before install day, not after. Old refrigerant lines get swapped out too in most cases, since reusing them with a new system risks contamination that shows up as poor performance down the road.
A contractor should walk the home, check the windows and insulation, and run a room by room load calculation before naming a size. A quote based on square footage alone, or on matching the old system, tends to land on the wrong size heat pump for the house.
Every heat pump has a capacity rating at low outdoor temperatures, and that rating drops as the air outside gets colder. Units that look the same on paper can behave very differently on the coldest night of the year, so ask for that low temperature number specifically, not just the standard rating.
Size is the biggest cost driver, and it works in both directions. A heat pump too small for the house runs constantly and still can't keep up on the coldest days. One too large short cycles, turning on and off faster than it should, which wears the compressor and leaves rooms feeling clammy instead of warm. Beyond sizing, the ductwork matters as much as the unit itself. Ducts that are too narrow, leaky, or poorly laid out force the new system to push against resistance it wasn't designed for, and fixing that is often where a quote grows. Where the outdoor unit sits and how the electrical panel handles the new load also factor in, since not every panel has room for another circuit without upgrades.
Install day starts outside. The old condenser gets disconnected and set aside, and the new outdoor unit goes on its pad or bracket, leveled, because a unit sitting even slightly off level wears its compressor wrong over time. Refrigerant lines run between the outdoor unit and the indoor coil, and those get pressure tested before anything is charged, to catch a bad joint while it's still easy to fix. The electrical hookup is its own step, tying into the circuit or panel upgrade agreed on beforehand. Once everything is connected, the system gets charged with refrigerant to the manufacturer's spec and run through its paces in both directions, heating and cooling, before the crew signs off. A thermostat gets set up last, since that's what the household will actually be living with every day after.
