Most homes here run on electric heat
Electricity heats 59.9% of occupied homes in Kittitas County, more than any other fuel. A heat pump fits that setup without adding a new fuel line or a gas hookup.
Takes about a minute. No obligation.
Electricity heats 59.9% of occupied homes in Kittitas County, more than any other fuel. A heat pump fits that setup without adding a new fuel line or a gas hookup.
If your home already heats with electricity, a heat pump replaces the equipment but not the wiring behind it. The contractor sizing the job will still check your panel and circuit before anything goes in.

Winter storms hit Kittitas County about 26 times a decade, and overnight lows average 23°F in December, January and February.
A heat pump here needs to hold up through a hard freeze now and then, not run at peak output all year.




Kittitas County sits in climate zone 5B, a cool zone where heating carries more of the load than cooling does. Any split-system heat pump installed here new has to meet the federal minimums that took effect in 2023. That means 14.3 SEER2 for cooling and 7.5 HSPF2 for heating. HSPF2 is the number that matters more in this county, since the heating load is bigger than the cooling load. A unit that clears both minimums qualifies as a baseline system here, and buyers may also qualify for the federal tax credit on top of that.
A standard heat pump that clears the federal minimums will handle a freeze at 23°F and the storms that come with it. Pick one sized right for your home and skip paying for output you won't use.
Find a contractorAn old heat pump due for replacement has usually been losing ground for a while before anyone decides to pull it out. The compressor works harder each year to hold the same temperature, because the refrigerant charge drifts low or the coils outside get caked with dirt and debris. Once a compressor starts short cycling, turning on and off instead of running a steady stretch, the rest of the system wears faster trying to keep up. Defrost cycles get longer too, since the outdoor coil has to shed ice more often as the unit ages, and every defrost cycle borrows heat from inside the house to do it. None of that shows up as a single breakdown most of the time. It shows up as a system that runs more and heats less, until the day it doesn't start at all.
A contractor works out heat pump size from the walls, the windows, the insulation and how much air leaks out, room by room. A flat rate per square foot skips all of that, and homes built differently need different sized equipment even at the same size.
A heat pump too big for the house blasts a room to temperature and shuts off before it ever settles into a long steady cycle, and that steady cycle is what pulls moisture out of the air and evens out temperature room to room. Short cycling like that also wears the compressor faster. Undersized just runs longer to catch up. Oversized runs wrong from the start.
Ask what the HSPF2 and SEER2 numbers are for the exact model on the quote, not the product line it belongs to. Contractors sometimes quote a line by its best-case rating when the specific size you need falls lower on the chart. Ask how the compressor stages, whether it runs single speed or varies its output, because that changes how evenly it heats and how often it cycles on and off. Ask what sound rating the outdoor unit carries if it will sit near a bedroom window or a patio. And ask what happens at the coldest point in the system's rated range, whether it still delivers heat on its own or leans on backup heat strips to make up the difference.
Installation day starts with the old equipment coming out, not the new unit going in. The crew disconnects the refrigerant lines, pulls the indoor and outdoor units, and checks what the old line set and electrical whip can handle before deciding what stays and what gets replaced. Line sets often get swapped rather than reused, since the wrong diameter or a line contaminated from the old system will cause problems in the new one. The outdoor unit goes on a pad or mounting brackets, leveled so condensate and refrigerant oil move through the system the way they're supposed to. Indoors, the air handler or coil gets set and the electrical connections get made. Then the system gets evacuated to pull moisture and air out of the lines before refrigerant goes in. The last part of the day is commissioning. The contractor runs the system through a full cycle, checks refrigerant charge against the manufacturer's numbers, and confirms airflow at the vents matches what the equipment was sized to deliver.
